RS Integrated Supply Logo
  • We are a global MRO supply chain services provider, offering outsourced procurement and storeroom solutions for MRO and indirect materials, including consumables and PPE.

    PROCUREMENT

    STOREROOM SOLUTIONS

  • We provide a 360-degree MRO management platform, designed and maintained by in-house engineers, delivering labor-saving technologies for global clients and operational teams.

    OUR PLATFORM

    RS SYNC™ is totally flexible allowing a 2-way, real-time integration to all major ERP, CMMS, and P2P systems.

    We follow your existing processes and best practices while providing transparency on transactions and data.

  • Operating across North America, the UK, EMEA, and APAC, we proudly serve the world’s leading blue-chip companies with comprehensive MRO services supporting a wide range of industries.

    INDUSTRIES

  • RS Integrated Supply Building Logo

    We are a part of RS Group, established in 2022 by the merging of IESA, based in the United Kingdom, and Synovos, based in the United States.

Customers Success Story Driving Efficiency in Automotive Manufacturing

Driving Efficiency in Automotive Manufacturing

Discover how RS Integrated Supply enabled a leading automotive client to save £502K by optimizing JIT MRO supply chain processes across nine UK and EMEA sites.

Published on

Read time: 5 minutes

Automotive-Manufacuting-Success-Story-RS-Integrated-Supply

The automotive industry is well known for its precision in the manufacturing plant, with parts and components delivered “just in time” (JIT) to be installed on the moving production line. That reputation has deep roots. While the idea of using interchangeable parts to improve efficiency dates to the Romans, it wasn’t until early in the 20th century that the concept was popularized by Henry Ford when making his Model T.

That process has only been improved upon, as bigger, faster, and smarter technology has brought still newer ways to be more efficient. That thirst is never quenched. 

Background

For several years RS Integrated Supply has supported a large global automotive manufacturer with a significant manufacturing footprint in the United Kingdom and EMEA regions.

Our involvement includes:

  • strategic product sourcing,
  • transactional buying and processing,
  • storeroom management services, and
  • a delivery framework supporting multiple sites, including a centralised bespoke distribution centre.

Truly integrated within this customer’s manufacturing facilities, RS Integrated Supply manages nine sites, thirteen storeroom locations, over 1000 predefined delivery points, all supporting and maintaining the line side routine and scheduled MRO workflows, through to emergency requirements on a JIT basis.

Meanwhile, the client operates on a strict 24/5 schedule with frequent weekend overtime.

The Challenge

Following planned vehicle model launch delays due the pandemic, this auto giant has experienced a strong post-COVID-19 recovery period, coupled with a sale and orderbook uplift that was outstripping production capabilities. This, in conjunction with a growth roadmap to introduce fully electrified vehicles, required the introduction of an additional fully equipped vehicle car body construction facility. That facility was introduced as part of a wider upgrade program.

At the same time, a global but volatile supply chain, previously scaled back during COVID, resulted in restricted and slow supply of component parts. Many of those components are assembled off site by third parties and shipped for final assembly.

RS Integrated Supply was engaged to repeat a similar previous project; to procure, purchase and hold in inventory a large and diverse range of parts to enable factory MRO workstreams. The requirement was for all parts to be held on hand in readiness to maintain this new production line with routine MRO materials as well as emergency spare parts and critical spares.

A MRO Integrated Supply Success Story of a Global Automotive Manufacturing Company who partnered with RS Integrated Supply to enhance its Maintenance, Repair, and Operations (MRO) supply chain.

The Solution

RS Integrated Supply and the customer embarked on a jointly formed project team running a project plan over a nine-month period.

The RS team supporting this customer consisted of 90 people with an additional 15-20 individuals assigned to centralized functions, including purchasing. To ensure its effectiveness, multiple team members across several disciplines were involved in the project.

Through this team all parts were identified and appropriate stock holding requirements for each SKU identified. Then the go-to-market strategies were engaged both with specific Original Equipment Manufacturers (OEMs) and through RS Integrated Supply’s extensive supplier network. These strategies were then enacted through a dedicated team, working with suppliers and OEMs to complete a JIT process flow through to the stores management teams, who, through separate workstreams, created new additional stock holding locations.

Transactions were tracked using RS Integrated Supply’s proprietary MRO technology, maintaining parts visibility throughout the process, despite often long lead times and material shortfalls.

Additionally, the different teams held regular meetings to share status updates on required SKUs, tracking approvals, supplier acceptance, lead time, shipping, and availability, keeping the client thoroughly informed. 

Result

Throughout the project, reporting and progress visuals and milestone forecasting took place, including parts for which an additional critical focus was applied. This provided the customer with transparency and outlook visibility throughout the period.
 
During the project and through a detailed assessment of existing inventory, it was identified that a volume of spare parts was already available in the RS-managed storerooms that could be moved through internal transfer between facilities to preserve budget costs. This action alone generated £176K in cost avoidance for the customer.
 
The project overall was delivered in the timescale, with all outlined risks captured and managed, ensuring that not only could this customer maintain its orderbook commitments, but through the collaboration between the two businesses, an overall budget savings of £502k was achieved.
 
Total project budget assigned: £2,560m
Total Budget used: £2,060m
Total savings achieved: £502k*
*Includes items identified as in stock but needing to be reserved £176k
Number of individual parts identified for purchasing: 2,724
 
The client remains among RS Integrated Supply’s longest active accounts.